Reverse circulation drilling by Gateway Mining (ASX: GML) at its Gidgee project in Western Australia has revealed a new gold target located between its two most advanced deposits.
Wide-spaced drilling at the new target has hit 10m at 9.2 grams per tonne gold and 15m at 3g/t gold.
Gateway’s managing director Peter Langworthy said the quality of these intersections in grade and thickness “provide a clear demonstration that we are working on a very significant gold system”.
( Image by https://www.gatewaymining.com.au/gidgee-gold-project )